IDRMS FotoFloor, FotoStretch, and FotoWall systems are specified against fire class testing, low-VOC emissions limits, and indoor air safety requirements. Documentation is supplied with every commercial project.
A site risk assessment and method statement (RAMS) is supplied for every commercial project, covering site preparation, substrate checks, and access control.
Ventilation procedures define airflow, curing windows, and occupancy restrictions during installation, so that the finished surface meets the emissions profile specified for the space.
Standardised method statements set out each installation step, so architects and commercial builders can review and approve the process before work begins on site.